Aramco Ras Tanura

Specializing in oil and gas projects, we provide innovative engineering solutions tailored to your needs.

  • Facebook
  • Twitter
  • LinkedIn
  • Instagram

1. INFRASTRUCTURE ENGINEERING 

Advanced sensor setup for underground leak detection on Ras Tanura pipelines by GCS AI+

Client: ARAMCO 
Location: Ras Tanura Oil Field Complex, KSA
Year: 2024
Project Value: SAR 1.3+ Billion
GCS Scope Fee: SAR 23 Million
Role: Project Director – Digital Twin & Underground Infrastructure
Team: 25 Engineers (Civil, Mechanical, Survey, BIM), 12 AI/Data Analysts, 10 Site Technicians
Area: Underground Utility - 133, 300 m²
Area: Scan To BIM - 54, 662 m²

 

Scope Of Work

GCS was hired by Saudi Aramco to detect Underground Utilities and Above ground scans to BIM at one of the oldest refineries in the world. The whole refinery was scanned and modeled in an exceptional time of 2 weeks. Three offices in Australia, U, and Dubai worked parallel on this project to meet all the deadlines regardless of the Covid 19 situation. WME Hired GCS for the structural Assessment of one of the oldest Malls in the capital of the UAE, Marina Mall Abu Dhabi. The team scanned all the elements of the structure and delivered the client in 2d&3d As-built drawings.  
 

AI-powered infrastructure survey at Aramco’s Ras Tanura facility using digital twin and leak detection solutions by GCS AI+.
Detailed piping system inspection at Ras Tanura oil facility captured during GCS AI+ site assessment.
Advanced sensor setup for underground leak detection on Ras Tanura pipelines by GCS AI+
AI-assisted structural analysis of Ras Tanura tank facility under GCS AI+ digital twin modeling
Advanced sensor setup for underground leak detection on Ras Tanura pipelines by GCS AI+
Advanced sensor setup for underground leak detection on Ras Tanura pipelines by GCS AI+
  • White Facebook Icon
  • White Instagram Icon
  • YouTube
bottom of page