top of page
2. Infrastructure Development
Utility Mapping:
Royal Guard of Oman, Sultan Palace
Client: Royal Guard of Oman
Location: Sultan Da Bous Palace – Oman
Area: 88, 000 m²
Scope Of Work
Having carried out the detailed survey, Technics was able to compare the GPR data and evidence from boreholes, which included optic fiber cables, water pipelines and sewerage. Analysis of the GPR data revealed the positions of a series of probable structures. The results enable the Client to undertake planned works with prior knowledge that will allow them to minimize damage.
bottom of page