1. INFRASTRUCTURE ENGINEERING 

gcs london 2012 olympics master 2.jpeg

London 2012

Olympics Master

Client: Olympics Delivery Authority

Location: South West England

Infrastructure Design: Makram Jaibaji

 

Background:

In order to ensure the site would have the flexibility for the future, the site design needed to be suitable for both large crowds attending the Olympics and for the smaller number of visitors to the site in the years following the games. During the planning of the central Olympic precinct, attention was given to ensuring that the large areas of a public domain required for the safe and comfortable passage daily of over 250,000 spectators could be reduced to provide a more intimate environment for future legacy developments.