top of page

1. INFRASTRUCTURE ENGINEERING 

gcs london 2012 olympics master 2.jpeg

London 2012

Olympics Master

Client: Olympics Delivery Authority

Location: South West England

Infrastructure Design: Makram Jaibaji

 

Background:

In order to ensure the site would have the flexibility for the future, the site design needed to be suitable for both large crowds attending the Olympics and for the smaller number of visitors to the site in the years following the games. During the planning of the central Olympic precinct, attention was given to ensuring that the large areas of a public domain required for the safe and comfortable passage daily of over 250,000 spectators could be reduced to provide a more intimate environment for future legacy developments.

14-london 2012 olympics master 1 8.jpg
  • White Facebook Icon
  • White Instagram Icon
  • YouTube
United Kingdom HQ :

1st Floor One Mayfair, 
Place Devonshire House Mayfair 
W1J 8AJ

T:  +44 (0) 207 268 4840
F:  +44 (0) 1202 313 601
M: +44 7472 447214

GET IN TOUCH

© 2022 by Global Construction Solutions. Proudly created by tasmimzone 

bottom of page